4.1.1 LOAD CURRENT TRANSFORMER
WARNING! - Do not disconnect this plug when the CT is carrying current. Disconnection will open
circuit the secondary of the C.T. and dangerous voltages may then develop. Always ensure the CT is not
carrying current and the CT is short circuit connected before making or breaking connections to the
module.
NOTE: - Load CT is NOT REQUIRED in a system including only one mains supply (with one 8660
controller). See section below detailing advantages of the load CT in a multiple mains (multiple 8660)
system.
NOTE: - The 8600 series module has a burden of 0.5VA on the CT. Ensure the CT is rated for the
burden of the 8600 series controller, the cable length used and any other equipment sharing the CT. If in
doubt, consult your CT supplier.
NOTE: - Take care to ensure correct polarity of the CT primary as shown below. If in doubt, check with
the CT supplier.
Pin
No
Description CABLE
SIZE
NOTES
56 CT Secondary for Load CT
2.5m
AWG 13
Connect to s1 secondary of Load CT
57 CT Secondary for Load CT
2.5m
AWG 13
Connect to s2 secondary of Load CT
NOTE: - Take care to ensure correct polarity of the CT primary as shown in the previous section. If in
doubt, check with the CT supplier.
4.1.1.1 ADVANTAGES OF LOAD CT
The load CT is only required when there is more than one DSE8660 on the same system.
When the load CT is fitted the 8660 transfers the right amount of load to the mains before disconnecting the
generator(s), preventing them from being shock loaded.
Without the load CT, the 8660 does not know how much load to transfer to the mains when other 8660’s are still in
island mode. The 8660 would transfer a pre-determined amount of load before disconnecting the generator(s) from
the mains. This would lead to there being too much load or not enough load transferred, and the generator(s) would
be shock loaded as the generator(s) disconnect from the mains.